Reserve Fund Health, Visualized
Track component lifecycles, model funding projections, and plan contributions with confidence.
Reserve Balance
$1.2M
Funded Level
72%
Annual Contribution
$185K
Components Tracked
34
Top Components
Overall Funding
Reserve Management
Plan Today, Protect Tomorrow
Comprehensive reserve planning tools that give your board the full picture.
Component Lifecycle
Parking Lot Seal
$52K
Pool Resurfacing
$85K
HVAC System
$175K
Roof Replacement
$420K
Track every major component from installation through replacement, with remaining useful life calculations.
Funding Projections
Model future funding levels against targets to ensure your reserves are on track for every obligation.
Contribution Planning
Compare funding scenarios side by side to find the right balance between dues and reserve health.
Component Breakdown
Visualize where your reserve dollars are allocated across major building systems and amenities.
Avoid special assessments
with better planning
Our reserve modeling tools help boards set appropriate contribution levels so unexpected expenses don't blindside your community.
- Funding gap analysis with actionable contribution scenarios
- 30-year projection models with inflation adjustments
- Compliance with state reserve study requirements
Roof replacement in 8 years is only 65% funded. Consider increasing contributions by $28/unit/month.
Reserve analysis -- Recommendation
Pool resurfacing is 88% funded and on track for 2028 replacement.
Component tracking -- On schedule
Accelerated plan reaches 100% funding by 2032 -- 4 years ahead of current pace.
Projection model -- Scenario comparison
Build a stronger
financial future
Join the founding pilot and get reserve planning tools that protect your community from costly surprises.